FNT Command DCIM
Prerequisite: FNT Command Basic
This course shows how with a currently deployed FNT Command c-base / c-line documentation, an existing data center can be integrated appropriately in the documentation with the DCIM solution. A data center, the footprints and the power documentation are created successively together with the participants, and during the course augmented with the topic climate zones. Furthermore, the procedure for connecting a completely new data center on so-called "green fields" is considered. The complete topic is complemented by the consideration of the various report possibilities within the DCIM environment.
Content overview:
- Procedure for the data center documentation based on an integrated practical example
- Creation and management of footprints for the graphical representation of rooms in data centers
- Displays of threshold violations in the areas of power, climate control and weight
- Management of weight details for CIs, cabinets and rooms
- Familiarization with all important areas of the power and climate-control documentation (the complete power chain from the end consumer to the generator)
- Creation and populating of new power distributors
- Wiring of fuses with the target devices and end consumers with regard to overload safety
- Use and evaluation of various analysis diagrams (e.g. climate-control, power and surface utilization)
- Display of the created footprints with 3D Footprint
- Configuration and display of a 3D Heatmap
Course duration: 1 day
Services:
- Trainer
- Lunch and refreshments
- Training documents in PDF
- Internet access / W-LAN
- One workplace per participant
Prerequisite:
- Min. number of participants 3 persons
The Training takes place at FNT GmbH.